Case Studies

Commercial

Stirling Road

 
Latest News

Latest News Story


How does the Flood & Water Management Act 2010 affect you?

The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More



case studies of consulting engineers

JNP Group consulting engineers services provided:

  • Civil Design
  • Structural Design
  • Drainage Design
  • Lorry & Car Park Design
  • Foundation Design

This project involved demolition of existing buildings and provision of a new two storey B1/offices/ warehouse development for Slough Estates. The construction consisted of insitu r.c. foundations supporting steel portal frames to the warehouse section and two storey steel frame to the offices. Pre-cast concrete flooring was used throughout the first floor and insitu reinforced fibre concrete for the ground floor.

JNP Group consulting engineers provided full Civil and Structural Engineering design services for all aspects of the project, including foundations, steel frame, car parking, access roads, drainage and surface water disposal.


Project: Stirling Road, Slough Trading Estate

Project: £2m

Client: Slough Estates


JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.