How does the Flood & Water Management Act 2010 affect you?
The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....
JNP Group consulting engineers services provided:


The schools comprised single and multi-storey blocks providing classrooms, laboratories, ADT facilities, kitchen and dining halls, sports halls and gymnasia. External works include roads, car parking, coach stations, drainage, all-weather pitches and multi-sports courts.

The multi-storey blocks comprised precast concrete frames and floors whilst the single storey blocks were in structural steelwork.

The PFI contract required Tilbury Douglas to manage the schools for 25 years following hand-over in 2003, to include all functions such as security, school meals, and maintenance etc., other than the educational function of the schools.
All aspects of design related to the length of the maintenance contract with the main structural frames of the buildings having a design life of 60 years.

Project Value: £45M
Client: Sheffield City Council
Architect: GHM Rock Townsend


Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.