The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....


JNP Group consulting engineers services provided:
Site Challenges
The site was shown on the EAs flood maps to be within Flood Zone 3 for the River Ouze, however the EA expressed concern regarding a lack of detailed modelling of the watercourses local to the site. These watercourses bounded the site on two sides and featured walled channels, bridges and culverts, forming part of the North Harrold Flood Alleviation Scheme and tributaries of the River Ouze.



Assessment Works
JNP Group undertook assessments of the catchment hydrology, structures and the Flood Alleviation Scheme, the works requiring:-
These works enabled JNP Group to accurately define flood levels at the site, demonstrating that the majority of the site lay outside of the floodplain and guiding development layout and levels, ensuring no flood risk to the development.
Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.