Latest News

Latest News Story


How does the Flood & Water Management Act 2010 affect you?

The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More


Grove Park

JNP Group

JNP Group consulting engineers services provided:

  • Pre-Planning Advice
  • Site Layout / Levels Advice
  • Flood Risk Assessment

JNP Group consulting engineers formed part of the planning team for this residential redevelopment in north-west London, providing advice on flood risk issues on development proposals and preparing a Flood Risk Assessment to support the successful planning application.

 

The Site
The site contained an existing residential property with hardstanding drive / patio areas and a soft landscaped rear garden with levels falling away from the property towards Dollis Brook, a tributary of the River Brent.

An initial review of the EAs flood maps revealed large areas of the site to be located within Flood Zones 2 and 3, thus requiring a Flood Risk Assessment to support the planning application.

           JNP Group            JNP Group

JNP Group Involvement
JNP Group accurately established the extents of the floodplain by obtaining the EA modelled flood levels and plotting against site topographic survey information.

Based on this accurate floodplain data JNP Group:-

  • Provided advice on the implications of national guidance (PPS25) on the planning application.
  • Provided guidance on site layout and levels with relation to flood extents.
  • Designed a flood compensation scheme which set levels around the proposed layout and mitigated for an increased building footprint within the floodplain.
  • Undertook a preliminary assessment of surface water drainage and set criteria for management of surface water runoff from the development.
  • Demonstrated safe means of escape from the development during flood events.
  • Undertook discussions with the EA to secure pre-planning approval of the above.

These works enabled JNP Group to provide a Flood Risk Assessment which satisfactorily demonstrated that the site could be developed with no increased risk of flooding on or off-site.

JNP Group
JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.