How does the Flood & Water Management Act 2010 affect you?
The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

JNP Group consulting engineers services provided:
High Wycombe STW was decommissioned in 2004 following the diversion of flows to a new STW at Little Marlow. Effluent from High Wycombe's population of 85,000 now travels 4km in a gravity sewer inside a 2.75m diameter service tunnel that has been cut up to 90m deep under the Buckinghamshire hills at a cost of £56m.
Fully treated effluent was traditionally discharged into the River Wye, so to maintain the hydrological and ecological balance a compensation flow of 300 l/s of 'clean' water is now pumped back from Marlow into the River Wye.
Demolition and contamination is currently being carried out for Thames Water under direction from JNP Group.
Construction of the main infrastructure and the first 50 residential units will commence in 2006.
This phased development will eventually comprise 350 new dwellings, a community building and a number of B1 industrial units.
Project: Wycombe Marsh, High Wycombe
Project Value: £70m
Client: Thames Water/ St James Homes

Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.