The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....
JNP Group consulting engineers services provided:
JNP Group consulting engineers provided a full civil and structural design service for the construction of this new build, 4500 sq m minor surgery unit
Floors are ‘Slimfor’ floors – composite concrete and deep profiled steel deck on asymmetric beams - to minimise the structural zone, and keep the very congested services zone clear of down-stand beams.
Facilities include three operating theatres, outpatient, twenty six private wards with en-suite bathrooms, an MRI scanner and and X-ray suite.
Novated to the Contractor, Leadbitter Construction, jnp have worked closely with the architect, Hall Needham Associates and the site team to assist with the fast track construction programme.
The building has been handed over to Capio and is now fully operational.
Project: Horton Hospital ISTC
Client: Capio Healthcare
Architect: Hall Needham Associates
Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.