Case Studies

Health

East Glade Centre

 
Latest News

Latest News Story


How does the Flood & Water Management Act 2010 affect you?

The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More



consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering

JNP Group consulting engineers services provided:

  • Structural Design
  • Foundation Design

JNP Group consulting engineers provided full structural engineering service to Sheffield Care Trust for two extensions to the East Glade Centre in South East Sheffield. The extensions were built in two phases to extend the floor space of the existing 1960’s single storey medical centre.

Phase 1

The first phase comprised a single storey load-bearing masonry structure with traditional trussed rafter roof. The ground floor slab was a suspended floor construction using precast concrete beam and block.

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering

Phase 2

The second phase required more extensive works; this comprised a two storey load-bearing masonry structure with one storey below ground floor level built into the embankment alongside the existing building incorporating a retaining structure. The lower ground floor consisted of a ground bearing concrete floor slab with the ground floor once again being precast concrete beam and block construction. The roof of the extension was constructed of timber trussed rafters

The facility provides GP and other medical services to residents in the Frecheville and Hackenthorpe areas of the city. These extensions have allowed the facility to keep up with modern medical working methods and have provided the users with many more available services than before.

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering

Project: East Glade Medical Centre

Phase 1 project value: £200,000
Phase 2 project value: £330,000

Client: Sheffield Care Trust

Architect: Race Cottam Associates

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.