Latest News Story
How does the Flood & Water Management Act 2010 affect you?
The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

JNP Group consulting engineers services provided:
A high water table and the close proximity of the Liverpool Street to Cambridge Railway Line presented some interesting engineering challenges that were overcome thanks to the skills of jnp group ‘s engineers.
From site appraisal through to the detailed civil and structural engineering design, jnp group helped ensure that best value and service was achieved throughout the development.

Project Value: £1.2M
Client: D W Windsor
Architect: Roy Millard Associates


Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.