How does the Flood & Water Management Act 2010 affect you?
The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....




Civil/Structural services included supervising a site investigation, drainage design (including storm water attenuation), foundation design, superstructure design and the justification of the existing structure and foundations to accept the new second storey.
Architectural services included the preparation and submission of the existing and proposed plans for planning. As part of the submission a contaminated land and flood risk assessment was submitted.
Upon, receiving planning approval a specification of building works and detailed construction plans were prepared and the scheme submitted for building regulations. JNP Group assisted the Client in the preparation of tender documents and guided the Client throughout the contract stages of the project, as well as liaising with the appointed Contractor.
Project Value: £400,000
Client: Blackhall Engineering
Architect: jnpgroup

Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.