
Case studies
jnpgroup consulting engineers exemplify the full range of engineering services through our specialist Chartered & Incorporated Consulting Engineers, Civil Engineers, Structural Engineers, Geo-environmental Engineers, and Traffic Engineers in these case studies.
|
Airport Gate Airport Gate is a 140,000 sq ft industrial/distribution development completed in July 1999, comprising an estate of 7 units in 3 blocks....click here for full case study |
![]() |
Cardington Gate An existing two storey amenity block was demolished to allow the existing warehouse to be extended. Variable ground conditions...click here for full case study |
![]() |
Container Prep Wash Facillity The project was to provide a new bunded self contained wash area for laboratory glassware, to clean the glass and control the disposal of wasteclick here for full case study |
![]() |
Cyclotron Vault, The Grove Centre The project was a design and build contract for a new cyclotron vault and associated clean room within an existing working laboratory facility building at the grove centre for GE Healthcare....click here for full case study |
![]() |
Distribution Warehouse Extension, The Grove Centre The project was a design and build contract for an extension and refurbishment to a existing warehouse distribution depot including design of foundations, steelframing, wall and roof cladding....click here for full case study |
|
Effluent Facility The project was to provide a new temporary effluent facility and refurbishment of an existing facillity between two working laboratory buildings at the grove centre for GE Healthcare. jnpgroup......click here for full case study |
|
Gateway XIII Gateway XIII is a development of 2 industrial / warehouse units with a total floor area of 100,000sq ft. The development lies alongside the new A13T in Rainham ...click here for full case study |
|
Hoddesdon Car Park The project was to provide increased car parking spaces by introducing a new raised car park deck approx. 30m x 100m with ramped car access for an existing, but now extended, Superstore...click here for full case study |
|
Pindar Road jnpgroup provided a full range of solutions to many challenges presented redeveloping this highly contaminated...click here for full case study |
|
Plant Room, The Grove Centre The project was a design and build contract for a new plantroom with associated ductwork and services to serve an existing laboratory.click here for full case study |
|
Stack Platforms The project was to design and detail new lightweight access platforms and ladders to 5 No. Ventilation Stacks on a Laboratory site to enable the stack discharge to be checked at various locations....click here for full case study |
|
Thames Gateway Thames Gateway Park is a development of high quality B8/B1 warehousing, distribution & light industial units of 430,000 sq ft....click here for full case study |
Our Clients













New look jnpgroup
'One stop shop' engineering