The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More



consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

JNP Group services provided:

  • Structural Design
  • Piling
  • Underpinning
  • Cladding
  • Surveying
  • Condition survey

JNP Group were commissioned by Serco to provide a scheme of works to provide a structure to support the existing facility that would remain robust and viable for the foreseeable future.

Blotoft Siding signal box was built in 1882 on the Lincolnshire line running between Spalding and Sleaford. It is situated at a manually gated level crossing at a remote location on Helpringham Fen.

The installation was of timber framed construction and was in a very dilapidated state. It had deteriorated due to attacks by woodworm and wet rot, and a temporary steel frame had been installed to support the operating floor. The condition of the original building had reached the point that it swayed laterally when subjected to the pressure wave of passing trains.

The constraints of limited clearance from the track and the requirement to maintain the signal box in full operation whilst the works were progressed meant that a remedial scheme to provide a new steel framed support structure within the existing fabric was necessary, and this would be used to carry the existing floor and roof.

The new steel framing is supported on a substructure of end driven steel tubular piles placed at either end of the building and the opportunity was taken to increase the length of the building to provide an improved working environment for the operative manning the box. The form and style of the original roof was extended and the refurbished walls were clad with steel composite insulated panels to provide an improved internal environment. The walls were then overclad with grp shiplap boarding to provide a building with the same character as the original signal box.

jnpgroup Blotoft Siding signal box jnpgroup Blotoft Siding signal box jnpgroup Blotoft Siding signal box

jnpgroup Blotoft Siding signal box

jnpgroup Blotoft Siding signal box

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.