The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

JNP Group services provided:
Mauldeth Road Station is a busy and important station on the Manchester city centre to airport line. The temporary bridge was necessary during works to re-construct platforms at the station as part of refurbishment and improvement works, and was also required to meet all current DDA requirements.

The construction of the bridge was complicated by the presence of overhead electrification cables which required the bridge to be sufficiently high to clear the power lines and this dictated that a solid parapet was required. The lightweight structure and solid parapets of the bridge in an exposed location, and the ground being a clay filled embankment dictated that the design had to incorporate a scheme of piled foundations which became critical in the tight programme to replace the platforms.
The project was completed to the required programme.


Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.