Case Studies

Rail

Signal Box, Medge Hall

 
Latest News

Latest News Story


How does the Flood & Water Management Act 2010 affect you?

The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More



consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

JNP Group services provided assessments on:

  • Structural Steelwork
  • Piled Foundations
  • Building Refurbishment

Medge Hall Signal Box in north Linclonshire was suffering subsidence and was leaning towards the track.

A system of piled foundations was installed to underpin the signal box, incorporating jacking points which allowed a steel frame to be introduced into the structure and this was subsequently used to reposition the body of the signal box to line and level, without interruption of the function of the installation, before the structure and fabric was refurbished.

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

Client: C Spencer Ltd for Network Rail

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.