Case Studies

Rail

Workington North

 
Latest News

Latest News Story


How does the Flood & Water Management Act 2010 affect you?

The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More


Grove Park

JNP Group

Workington North - Temporary Station

 

Following the devastating floods in Workington in November 2009 the main road and pedestrian links across the river were either lost or declared unfit for use.

Network Rail’s response was to build a temporary station and open it to the public within 7 days!

JNP GroupJNP GroupJNP Group


JNP Group rose to the challenge by providing structural details and on-site advice and supervision to enable Network Rail to fulfill its promises.

The station was opened as promised at 9.00 am Monday morning!

JNP Group

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.