The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....
JNP Group consulting engineers services provided:
The steel frame penthouse structure and roof including vaulted ceiling and dormer returns was designed to avoid loading the existing lightweight floor at that level. By using permanent steel shuttering for the insitu floors JNP Group consulting engineers were able to design a 'prop free' scheme enabling the contractor to work at all levels at once, thus speeding up the construction process.
JNP Group consulting engineers also designed the external works including accesses, parking and drainage.
Project: Redevelopment of former five storey technical college in Putney to provide 38 2/3 bed luxury apartments.
Project Value: £2.6m
Client: Barratt South London
The site: The site is located adjacent to the A3 close to Putney town centre flanked by residential property and a school. The scheme called for the excavation of a lower floor, addition of two mezzanine floors and the removal of the top floor to be replaced by a steel framed penthouse level. Internal alterations and open areas at ground floor dictated part internal steel frame with permanent steel shuttering and insitu concrete for additional floor construction.
Architect: Stefan Zins
Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.