The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More


consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

JNP Group consulting engineers provided full structural engineering design and detail of all foundations and superstructure based on in-situ reinforced concrete ground beams on CFA piles, with reinforced load bearing masonry superstructure. Disproportionate collapse is accommodated by additional reinforcement in each floor by using in-situ reinforced concrete topping and hollow rib profile metal decking, avoiding the need for tie columns and beams to satisfy the code requirements.

JNP Group’s consulting engineers commission extended to design and detail of the cantilevered and propped steel balconies, integrated with the timber frame and tower crane foundation design.

JNP Group consulting engineers also acted as Party Wall surveyor, in accordance with the Party Wall etc act 1996 and negotiated and prepared tower crane and scaffold oversail licences.

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

JNP Group consulting engineers also acted as Party Wall surveyor, in accordance with the Party Wall etc act 1996 and negotiated and prepared tower crane and scaffold oversail licences.

The existing ground level (level zero) was designated as an undercroft car park area to raise habitable areas above the defined flood plain, the site being immediately adjacent to the river Medway.

The development comprised 9 integrated blocks with 2 linked blocks facing Hart Street having a central ‘2 storey’ vehicle access into a central landscaped area with vehicle access to the undercroft car parking beneath all blocks

Client: Taylor Woodrow developments (formerly Wilson Connolly)

Architect: Grafik

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

Surface water discharge was by gravity, with attenuation to allow for ‘tidal lock’ directly into the river Medway by agreement with the Environment Agency.

The 1st floor structure comprised a flat reinforced concrete slab supported on columns, concrete shear walls and stairwells/lift shafts between ground and 1st floor. This was designed for an accidental damage loading of 34Kn/m2 where the total number of storeys exceeded 4.

consulting engineering, structural engineering, traffic engineering, flood risk prevention, civil engineering, rail engineering, rail engineering

Above 1st floor the superstructure comprised a timber frame construction in part 4 and 5 storey designed in accordance with the requirements for disproportionate collapse. The timber frame structure was designed and detailed by Prestoplan, a specialist timber frame manufacturer commissioned and instructed by Wilson Connolly direct.

JNP Group consulting engineers have subsequently been involved with inspection, reporting and remedial repairs, primarily associated with water ingress and timber shrinkage.

Plan 1

Plan 2

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.