The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

JNP Group’s consulting engineers commission extended to design and detail of the cantilevered and propped steel balconies, integrated with the timber frame and tower crane foundation design.
JNP Group consulting engineers also acted as Party Wall surveyor, in accordance with the Party Wall etc act 1996 and negotiated and prepared tower crane and scaffold oversail licences.
JNP Group consulting engineers also acted as Party Wall surveyor, in accordance with the Party Wall etc act 1996 and negotiated and prepared tower crane and scaffold oversail licences.
The existing ground level (level zero) was designated as an undercroft car park area to raise habitable areas above the defined flood plain, the site being immediately adjacent to the river Medway.
The development comprised 9 integrated blocks with 2 linked blocks facing Hart Street having a central ‘2 storey’ vehicle access into a central landscaped area with vehicle access to the undercroft car parking beneath all blocks

Client: Taylor Woodrow developments (formerly Wilson Connolly)
Architect: Grafik

Surface water discharge was by gravity, with attenuation to allow for ‘tidal lock’ directly into the river Medway by agreement with the Environment Agency.
The 1st floor structure comprised a flat reinforced concrete slab supported on columns, concrete shear walls and stairwells/lift shafts between ground and 1st floor. This was designed for an accidental damage loading of 34Kn/m2 where the total number of storeys exceeded 4.

Above 1st floor the superstructure comprised a timber frame construction in part 4 and 5 storey designed in accordance with the requirements for disproportionate collapse. The timber frame structure was designed and detailed by Prestoplan, a specialist timber frame manufacturer commissioned and instructed by Wilson Connolly direct.
JNP Group consulting engineers have subsequently been involved with inspection, reporting and remedial repairs, primarily associated with water ingress and timber shrinkage.


Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.