Latest News Story
How does the Flood & Water Management Act 2010 affect you?
The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....


The biomass fuel is to replace up to 12.5% of the coal used at the World’s largest coal fired power station in North Yorkshire. JNP Group provided structural designs for the conveyor transport system.



The biomass fuel arrives by either road tanker or rail from Immingham docks to a storage facility of four silos. A re-cycling conveyor system agitates the fuel to prevent stagnation and the build up of gases. It then conveys the fuel to the generators at the rate of 600tonnes/hour.
The conveyors rise to a height of 50metres prior to discharge into the boiler silos.

Our Brochure
Download our company brochure as a PDF.
Latest Case Studies
View detailed information about all our latest projects.
Office Locations
Get in touch – Details of our UK Offices and Key Personnel.