Case Studies

Traffic and Highways

Former Acton Bus Depot

 
Latest News

Latest News Story


How does the Flood & Water Management Act 2010 affect you?

The new Act will impose much greater liabilty on developers to obtain detailed design approval to surface water drainage at the Planning Stage rather than at detailed design stage. JNP Group have extensive experience of cost effective approaches to surface water drainage strategy and design and will be pleased to help you....

Read More


Grove Park

JNP Group

JNP Group consulting engineers services provided:

  • Transport Assessment
  • Interim Travel Plan
  • Proof of Evidence for Planning Appeal
  • Expert Witness at Planning Appeal
  • Preliminary Design of Off-site Highway Works
  • Design of internal car park and delivery bay arrangement
  • Detailed Design of S278 Works
  • Road Safety Audit

The long disused Acton Bus Depot made way for a new mixed-use development of 89 flats and 1,000 square meters of retail areas.  jnpgroup acted as the transport consultants and provided their services during the planning, appeal, and detailed design stages

The site is situated in a challenging location on the corner of two of the most heavily trafficked streets in Acton, in a Controlled Parking Zone (CPZ) and partly within Acton Town Centre Conservation Area. Nearby junctions work at capacity and there are frequent bus services operating on adjacent roads. Traffic was thus one of the biggest issues the developer was facing.

JNP GroupJNP GroupJNP Group

The developer wanted to provide parking for a limited number of vehicles on the ground floor of the building to increase the value of apartments, but Ealing Highways initially insisted on a car-free development and recommended the refusal of the planning application on grounds of high traffic generation. A Transport Assessment (TA) prepared by jnpgroup and comprising extensive capacity assessment for 5 no. nearby junctions however proved that the traffic impact of the development would be minimal. This was confirmed in an independent appraisal of the TA undertaken by TfL. In addition, jnpgroup supplied an Interim Travel Plan aiming to further reduce the dependence on private vehicles. This, together with a robust Proof of Evidence prepared by jnpgroup, paved the way for the Appeal Inspector’s decision to overrule the Council and grant planning permission.

JNP Group

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.