FIVE LOCATIONS NATIONWIDE
FIND AN OFFICE NEAR YOU »

Lambrook School, Berkshire A 25m swimming pool complete with viewing deck and spectators seating, changing facilities, café, reception area and office space. JNP Group services provided: Piled reinforced concrete sub-structure. Steel portal framed superstructure. SuDS feasibility and detailed drainage design. Value: £2.2m Client: The Board of Governors Architect: Morse Webb Contractor: Amiri Construction

Fir Vale School Classroom and Laboratory Block Extension. Fir Vale School was built as part of the first multi-schools Public Finance Initiative scheme to be undertaken in the country. The re-built school has provided an environment which has encouraged the positive development of the academic process and brought it to a position where the school…

Priesthorpe School A senior school with 1,200 pupils aged 11 to 18. Located in Pudsey, west Leeds, the school was constructed in the 1960s, the majority of which is of single storey steel framed construction with a five storey tower block and two storey block added as a more recent extension. JNP Group were commissioned…

Grove Park A design & build project for the London Borough of Brent this 1000 m² building was designed to cater for the sixth form of two special needs schools. Together with standard Doc M Sanitaryware, ceiling track lift systems were installed in all the teaching areas. The modern design of the structure included steel…

Sheffield Schools The Sheffield Schools Private Finance Initiative (PFI) comprised new and refurbished buildings at six senior & junior school sites in the Sheffield area. Tapton School King Edward VII Lower School Fir Vale School Owler Brook Nursery Ecclesfield School Mosborough Primary School The schools comprised single and multi-storey blocks providing classrooms, laboratories, ADT facilities,…

© 2016 JNP Group Consulting Engineers | 30 Years of Engineering Excellence!