Lodge Farm Wind Turbine s Lodge Farm is the site of a wind turbine in Wymeswold, Leicestershire The project consisted of the erection of a single 80m high wind turbine, situated within open fields. JNP Group services provided: Desk study and intrusive Geotechnical ground investigation at the site. Provision of advice to assist with the…

Woolley Hill Wind Farm This wind farm development is located near to Ellington Village, Cambridgeshire. The development comprised 4 wind turbines on agricultural farm land. Ground improvement was used on site to value engineer the design of the site tracks. JNP Group services provided: On-site tracks and site entrance. Crane hard standings. Construction compound. Earthworks…

Kirkthorpe Hydropower Scheme Kirkthorpe Hydropower scheme situated on Kirkthorpe Weir on River Calder, near Wakefield, South Yorkshire. Kirkthorpe Hydropower scheme is Yorkshire’s largest-ever low head hydro-electric scheme and is situated on the largest weir in West Yorkshire. JNP Group were commissioned to provide structural and civil engineering services on the project. The scheme consists of…

Thrybergh Hydropower Scheme Situated on Kilnhurst Weir on the River Don, Thrybergh, near Rotherham, South Yorkshire. Thrybergh Hydropower scheme is currently the largest low head hydro scheme in Yorkshire and the largest plant commissioned in England in the last 3 years. JNP Group were commissioned to provide structural and civil engineering services on the project….

Wadlow JNP Group was appointed Infrastructure designer the Tender and Detailed design of Wadlow Wind Farm in Cambridgeshire. JNP Group undertook design of all on-site infrastructure including site tracks, crane hardstandings, assist pads and contractor and control building compounds. Additionally JNP Group undertook structural design and detailing of the on-site substation. JNP Group is always…

Drax Power Station Renewable Biomass  Co-firing Plant Drax Power has undertaken a major £50M project to install a bio-mass fuel supply system to co-fire alongside the coal fired generators. The biomass fuel is to replace up to 12.5% of the coal used at the World’s largest coal fired power station in North Yorkshire. JNP Group…