FIVE LOCATIONS NATIONWIDE
FIND AN OFFICE NEAR YOU »

_dsc7980-final-fi

Lindfield Phase 3

_dsc7980-final-16-9-cropped

Land at Scamps Hill Lindfield comprises 26 ha of agricultural land.

Proposals for this phase comprise 200 new dwellings, a new primary school and a country park. Phases 1 and 2 have already provided nearly 300 new dwellings and associated infrastructure. JNP Group undertook the same services for these phases.

JNP Group services provided:

  • Flood Risk Assessment.
  • SuDS surface water drainage strategy.
  • Integration and assessment of existing overland surface water flows.
  • Creation of several water features, swales and ponds to provide attenuation and bio diversity.
  • Foul water strategy.
  • Analysis, assessment and provision of utility proposals to service the development.

Project Value: £25m

Client: Wates Developments

© 2016 JNP Group Consulting Engineers | 30 Years of Engineering Excellence!