Lodge Farm Wind Turbine

s

Lodge Farm is the site of a wind turbine in Wymeswold, Leicestershire

The project consisted of the erection of a single 80m high wind turbine, situated within open fields.

JNP Group services provided:

  • Desk study and intrusive Geotechnical ground investigation at the site.
  • Provision of advice to assist with the design of the access track, crane platform and turbine foundation.
  • Design and detailing of reinforced concrete ground bearing foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

Higher Goonamarth Wind Turbine

ras-hgt-16-9-custom

Higher Goonamarth Farm is the site of a wind turbine near Trewoon, St Austell.

The project consisted of the erection of a single 80m high wind turbine within open agricultural land used for grazing of livestock.

JNP Group services provided:

  • Desk study and intrusive Geotechnical ground investigation at the site.
  • Provision of advice to assist with the design of the access track, crane platform design and turbine foundation.
  • Design and detailing of reinforced concrete ground bearing foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

Gunheath Pit Wind Turbine

ras-gt-16-9

Gunheath Pit is the site of a Wind Turbine located on the eastern part of an unused china clay quarry.

The project involved the erection of a single 80m high wind turbine, located just within the quarried area, on a quarry bench.

JNP Group services provided:

  • Desk study and supplementary Geotechnical ground investigation at the site.
  • Provision of advice to assist with the design of the access track, crane platform and piled turbine foundation.
  • Design and detailing of piled reinforced concrete foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

Craigthornhill Farm Wind Turbine

ras-ct-16-9

The site for a wind turbine in Glassford, South Lanarkshire.

The project consisted of the erection of a single 80m high wind turbine within open farmland.

JNP Group services provided:

  • Desk study and intrusive Geotechnical ground investigation at the site.
  • Provision of advice for the design of the site access track, crane platform and turbine foundation.
  • Design and detailing of reinforced concrete ground bearing foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

Greensplat Wind Turbine

ras-gt-16-9

The site of a wind turbine located on top of an existing china clay waste tip in Cornwall.

The project consisted of the erection of a single 60m high wind turbine. The waste tip was approximately 20m high with a plateau area at its summit.

JNP Group services provided:

  • Desk study and supplementary Geotechnical ground investigation at the site.
  • Provision of advice to assist with the design of the access track, crane platform and piled turbine foundation.
  • Design and detailing of piled reinforced concrete foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

Boghead Farm Wind Turbine

ras-bt-16-9-custom

Boghead Farm is the site of a wind turbine in Limekilnburn, Hamilton

The project consisted of the erection of a single 70m high wind turbine within farmland.

JNP Group services provided:

  • Desk study and intrusive geotechnical investigation at the site.
  • Provision of advice for the design of the access track, crane platform and turbine foundation.
  • Design and detailing of reinforced concrete ground bearing foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

Castell Llwyd Farm Wind Turbine

ras-clt-16-9

Castell Llwyd Farm is the site of a wind turbine in Ystrad Mynach, Caerphilly.

The project consisted of the erection of a single 80m high wind turbine within open fields used for grazing.

JNP Group services provided:

  • Desk study and intrusive ground investigation at the site.
  • Provision of advice to assist with the design of the access track, crane platform and turbine foundation.
  • Design and detailing of reinforced concrete ground bearing foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

 

Blackpool Pit Wind Turbine

ras-bpt-16-9

Blackpool Pit is the site of a wind turbine on the southern part of an unused open cast china clay pit in Cornwall.

The project consisted of the erection of a single 80m high wind turbine.

JNP Group services provided:

  • Desk study and intrusive Geotechnical ground investigation at the site.
  • Provision of advice for the design of the access track, crane platform and turbine foundation.
  • Design and detailing of piled reinforced concrete foundation.
  • On-site checks during the construction of the foundation.

Client: Clean Earth Energy

 