FIVE LOCATIONS NATIONWIDE
FIND AN OFFICE NEAR YOU »

Woolley Hill Wind Farm

RAS-WHW (16-9)

This wind farm development is located near to Ellington Village, Cambridgeshire.

The development comprised 4 wind turbines on agricultural farm land. Ground improvement was used on site to value engineer the design of the site tracks.

JNP Group services provided:

  • On-site tracks and site entrance.
  • Crane hard standings.
  • Construction compound.
  • Earthworks and testing specification.
  • Reinstatement plans.
  • Provision of Geotechnical advice and design.

Client: Danaher & Walsh

CategoryGreen Energy
© 2016 JNP Group Consulting Engineers | 30 Years of Engineering Excellence!