FIVE LOCATIONS NATIONWIDE
FIND AN OFFICE NEAR YOU »

Springfield Hospital Oncology Centre

h-shoc-16-9_new

A state of the art cancer treatment facility in Chelmsford comprising two linear accelerators and a chemotherapy unit.

The two LinAcc ‘bunkers’ were constructed with ultra-dense concrete blocks in pre-fabricated packs slotted into and on a tailor made structural steel frame.

The chemo treatment block is of modular construction.

JNP Group services provided:

  • Site investigation.
  • Foundations.
  • Co-ordination with modular and linear accelerator bunker superstructure designs.
  • Drainage.
  • Highways and paving.

Project Value: £4m

Client: Ramsay Healthcare

Project Manager: Firn

Architect: Hall Needham Associates

CategoryHealth
Tags
© 2016 JNP Group Consulting Engineers | 30 Years of Engineering Excellence!