JNP Group

Engineering Services

Flood Risk Assessment

 
Grove Park

Latest Case Study

This 1800m2 structural steel and ‘glulam’ framed two storey building comprises civic offices, a council chamber, a community hall, general offices and conference rooms

  • Foundation design
  • Structural steelwork
  • Glulam timber
  • RC lift pit
  • Foul and surface water design
  • Roads and pavings
  • Geo-environmental advice

Read More

Flood Risk Assessment

consulting engineers,structural engineers,traffic engineers,civil engineers,rail consulting, party wall surveyors

The JNP Group team provide flood risk assessments for projects ranging from single infill housing to major supermarket developments. These include strategic flood reviews, fluvial & tidal flood estimations, single and multi catchment conditions and surface water drainage strategies.

An early review of flooding issues avoids planning delays. FRA’s are required for:

  • All sites within or part within Flood Zone 2 & 3
  • If the site is greater than 1 hectare
  • Also – can be used to gain points within the “code for sustainable homes”

consulting engineers,structural engineers,traffic engineers,civil engineers,rail consulting, party wall surveyors consulting engineers,structural engineers,traffic engineers,civil engineers,rail consulting, party wall surveyors
consulting engineers,structural engineers,traffic engineers,civil engineers,rail consulting, party wall surveyors

JNP Group work closely with the Enviroment Agency with innovative solutions to resolve flooding problems. This links with our wide Civil Engineering design skills in drainage, attenuation and road design ensuring that the client has a solution that can translate into cost effective construction.

JNP Brochure
Latest Case Study
JNP Office Locations

Our Brochure

Download our company brochure as a PDF.

Latest Case Studies

View detailed information about all our latest projects.

Office Locations

Get in touch – Details of our UK Offices and Key Personnel.