Park South Signal Box, Permanent and Temporary Works Park South is a signal box in Cumbria.  The lever frame within the signal box had subsided, causing issues with its mechanical operation. The causes of the subsidence needed to be investigated, together with proposals to install temporary and then permanent works. The main issue for the…

Llanfairpwll Station Footbridge Refurbishment design and specification, including the remediation of defective structural members, for a lattice girder passenger footbridge. Llanfairpwll Station is a popular tourist attraction due to its extended name, which translates to “St Mary’s Church in the hollow of white hazel near a rapid whirlpool and the Church of St. Tysilio near…

Liverpool Central Station An extension and refurbishment of the concourse area and installation of new link bridge to new staff accommodation. A major upgrade to the concourse area, ticket gates, waiting areas, and public conveniences, plus the construction of a new staff building and glazed link bridge. The existing passenger access to the lifts to…

Ellesmere Port Station A full refurbishment to the station to bring the building back into use as a retail unit and offices. JNP Group initially carried out a structural inspection of the station building prior to a full interior and exterior refurbishment being carried out. The ornate chimneys on the building were in poor condition…

Birkenhead North Station Footbridge Improvements to car parking arrangements at Birkenhead North Station required the construction of a bridge over the railway to link the new car park to the station. The new two span footbridge provides access from the car park to the island platform and the main station building. Access for All was…

Manchester Victoria Station JNP Group acted as designer for C Spencer Ltd for a scheme of repairs to various areas of the roof of Manchester Victoria Station. The roof was defective in several locations due to a combination of age, corrosion of steelwork caused by exposure to the prevailing weather and to the aggressive environment…

Workington North – Temporary Station Following the devastating floods in Workington, the main road and pedestrian links across the river were either lost or declared unfit for use. Network Rail’s response was to build a temporary station and open it to the public within 7 days (!) JNP Group rose to the challenge by providing…

Elstree & Borehamwood Transport Hub New transport interchange for First Capital Connect. JNP Group designed a completely new layout for DDA rail and bus interchange, taxi and private car pick-up and drop-off, cycles, and pedestrians. We liaised with numerous stakeholders who represented various passenger groups, rail, bus and taxi operators, and regulatory authorities. We worked…