Springfield Hospital Oncology Centre
A state of the art cancer treatment facility in Chelmsford comprising two linear accelerators and a chemotherapy unit.
The two LinAcc ‘bunkers’ were constructed with ultra-dense concrete blocks in pre-fabricated packs slotted into and on a tailor made structural steel frame.
The chemo treatment block is of modular construction.
JNP Group services provided:
- Site investigation.
- Foundations.
- Co-ordination with modular and linear accelerator bunker superstructure designs.
- Drainage.
- Highways and paving.
Project Value: £4m
Client: Ramsay Healthcare
Project Manager: Firn
Architect: Hall Needham Associates