Wadlow JNP Group was appointed Infrastructure designer the Tender and Detailed design of Wadlow Wind Farm in Cambridgeshire. JNP Group undertook design of all on-site infrastructure including site tracks, crane hardstandings, assist pads and contractor and control building compounds. Additionally JNP Group undertook structural design and detailing of the on-site substation. JNP Group is always…

Drax Power Station Renewable Biomass  Co-firing Plant Drax Power has undertaken a major £50M project to install a bio-mass fuel supply system to co-fire alongside the coal fired generators. The biomass fuel is to replace up to 12.5% of the coal used at the World’s largest coal fired power station in North Yorkshire. JNP Group…

Sowerby Open Air Market JNP Group were engaged by Calderdale Council to provide civil and structural engineering services for the re-development of a town centre site in Sowerby Bridge. The project was to provide a new open air market for the street traders of the local area as part of an urban regeneration scheme, as…

Openshaw District Centre Openshaw District Centre is a key element in the regeneration of East Manchester providing a Morrisons Hypermarket & 120,000 ft² of non food retail. JNP Group have provided all Civil, Structural and Environmental Engineering advice from inspection to completion. This included all site investigation matters, flood risk assessment and expert witness at…

Silk Works Residential Development of the former silk works site in Lewisham. This 0.5 hectare brown field site was developed to provide a 6 to 10 storey structure with basement car parking, class B1 business area for retail use at ground floor and 296 residential apartments. Using the latest Finite element software, JNP Group designed…

First Central First Central is a major residential development built on part of the former Guinness Brewery site in Park Royal. The development comprised 150 apartments, a community centre, and a nursery in six seperate blocks. Four of the blocks are on a podium slab over an underground car park. Superstructures comprised a mixture of…

Hart Street JNP Group consulting engineers provided full structural engineering design and detail of all foundations and superstructure based on in-situ reinforced concrete ground beams on Continuous Flight Auger (CFA) piles, with reinforced load bearing masonry superstructure. Disproportionate collapse is accommodated by additional reinforcement in each floor by using in-situ reinforced concrete topping and hollow…

Stone JNP Group undertook a full range of civil, structural and environmental engineering services on behalf of developer Crest Nicholson, for redevelopment of a former Nurses Home at Stone Hospital near Aylesbury in Bucks. Foundations on the site were designed to account for disused foundations and cellars, old pits, clay soils and trees. The roads…

Sandhurst Park This mixed residential development of 2 to 3 storey houses and 4 storey flats, by Barratt Kent was under taken on a highly contaminated former gas works. The site was bound, to the east by an operational gas works and to the north by a main line railway. The scheme included significant remediation…

Workington North – Temporary Station Following the devastating floods in Workington, the main road and pedestrian links across the river were either lost or declared unfit for use. Network Rail’s response was to build a temporary station and open it to the public within 7 days (!) JNP Group rose to the challenge by providing…