Skip to content

Civil Engineering

Recognising each and every project brings its unique challenges.

Ensure your infrastructure works are designed, approved and constructed in the most cost-effective and environmentally friendly way.

Your assistance has proved most valuable…thank you for your support …should matters arise that need clarification we will not hesitate to contact you.

Crest Nicholson

Feasibility Studies

Site Optimisation

Level, Drainage, Foundation Strategy

SuDS and Water Quality Assessment

Foul and Surface Water Capacity Assessment

Roads and Highways

Section 38 Adoption

Section 278 Design and Detailing

Private Road Design and Detailing

Pavement Design

Setting Out

Street Lighting

Sustainable Drainage (SuDS)

Water Quality Assessment

Ponds and Detention Basins

Swales and Wetlands

Filter Drains

Soakaways / Infiltration Basins

Permeable Pavements

Attenuation Tanks

Flow Control Measures

Land Development

SuDS Management and Maintenance Plans

Foul and Surface Water Drainage

Section 104 Adoption

Section 185 Diversion of Public Sewers

Section 98 Requisition of Public Sewers

Section 106 Application to Connect to a Public Sewer

Private Drainage Design and Detailing

Levels and Earthworks

Levels Design and Detailing

Retaining Walls

Cut and Fill Assessment

Slope Stability

Rail Infrastructure