Skip to content
Menu

Springfield Hospital Oncology Centre

A state of the art cancer treatment facility in Chelmsford comprising two linear accelerators and a chemotherapy unit.

The two LinAcc ‘bunkers’ were constructed with ultra-dense concrete blocks in pre-fabricated packs slotted into and on a tailor made structural steel frame.

The chemo treatment block is of modular construction.

Project Value: £4m

Client: Ramsay Healthcare

Design Services Provided

  • Site investigation
  • Foundations
  • Co-ordination with modular and linear accelerator bunker superstructure designs
  • Drainage
  • Highways and paving